Waltham – The End of the Line

Waltham terminus

The PPJ railway was meant to run from Ottawa, travel through Pontiac, and then reenter Ontario near Pembroke where it would meet the rail line to Western Canada. In the early 1890s, the train made it as far as Waltham, but construction on the rails was suspended because of a shortage of funds. At first, it was thought to be a temporary set-back, but around 1902-1903 hopes ran out for the continuation of the rail line. So, while Pontiac had planned to be a stop on the transcontinental line, it ended up being a dead end, which had a severe impact on the expected trade that the railway was to bring.

Picture: Canadian Pacific Junction Railway

The End of the Line

However, the train was still the major means of transport for the Pontiac community. The first morning train leaving Waltham quickly turned into a way for students from West Pontiac to attend school in Shawville. All along the line, the conductor would stop to pick up students waiting by the railway.

In 1928, the summer train left Ottawa at 7:25 a.m. and 3:40 p.m., arriving in Waltham at 10:50 a.m. and 6:55 p.m. For the trip into the big city, the train left Waltham at 6:30 a.m. and 11:45 a.m.

Suburban Time Tables

Farmers brought their wheat to the station to be transported and processed into flour. They often had surplus grain which they sold or bartered. The cultivation of wheat was prosperous in the Pontiac.

Canadian Pacific Railway Suburban Time Tables. April 1928.

Summer service 1928

Summer service 1928 (Ottawa & Waltham)

Extract of
The Cyclopark PPJ: A Pontiac Train Story

The Cyclopark PPJ: A Pontiac Train Story image circuit

Presented by : MRC de Pontiac

Get There

Download the BaladoDiscovery app (for Android and iOS) and access the largest network of self-guided tour experiences in Canada.